The construction of the new Tuilière football stadium is ongoing. INGPHI has been contracted by the firm Dr. Lüchinger+Meyer Bauingenieure AG in Zürich to insure works supervision such as checking the steel reinforcement bar placement prior to concreting.
The stands and a large part of sector A are now built. Corners between sectors A, B, C and D are being constructed. In these corners, large steel elements are placed and concreted. Prestressing cables will then be placed through prefabricated concrete beams on the whole perimeter of the stadium. These cables will link each of the corners and create a compression ring that will insure the equilibrium of horizontal forces in the whole structure.