• 22.08.2024

    Venoge footbridge in the spotlight

  • 8.07.2024

    Barboleuse Bridge – Installation of the Villars span

  • 3.06.2024

    Croix d’Or 6 Geneva

  • 14.05.2024

    Barboleuse bridge and booms

  • 12.03.2024

    Social Health-Care facility in Orée neighborhood

  • 29.09.2023

    SZS Steel Award 2023 – Ecublens footbridge

  • 19.09.2023

    SETEC Vengeron basins

  • 14.06.2023

    N21_GSB_thumbnail

    N21 Martigny – Grand St-Bernard