A timber framework is ideal to add an extra level to an existing building. Prefabricating the timber elements helped reducing the erection time on site. The entire framework was assembled in two weeks and the structure was watertight within a month. The video shows the erection in fast motion.

Share the article :
stade_tuiliere_006Tuilière Stadium
visite-pédagogique-Paudèze-INGPHIEducational visit of the Paudèze bridges