The École Polytechnique Fédérale de Lausanne (EPFL), represented by the Construction and Management unit, has planned to redevelop the premises of the PH L0 501, L0 502 and L1 500 physics building at Route de la Sorge in Ecublens. These premises have different uses and are located on two levels. There are laboratories on level 1 and office space on level 2.

The aim of the project is to increase the surface area of the laboratory on level 1 without disrupting the operation of the adjacent laboratory, and to compartmentalize the office space on level 2. In these offices, it is planned to create an open space of around 176 m2 for around 20 people.

The laboratory, housing a high density of technical equipment and requiring flexibility of use, was designed without intermediate supports, in order to offer large usable surfaces.

A wooden solution with a solid floor spanning 14 m was chosen. The main challenges were to manage the floor’s vibrations, and to build it above scientific equipment in operation throughout the construction period.

Glazed and opaque plaster walls separate the spaces while allowing natural light to filter through.

The spaces provided enable EPFL to pursue its activities in pleasant premises that meet today’s requirements.

  • Owner

    École polytechnique fédérale de Lausanne (EPFL)

  • Civil engineer and architect

    INGPHI SA, Lausanne

  • Construction companies

    Prométal Sàrl, Renens
    La Croix Charpente Sàrl, Mts-Pully
    Coloribat Sàrl, Crissier
    La Transfo Sàrl, Féchy
    Reichenbach SA, Tolochenaz
    Patrice Hofer SA, Renens

  • Provided services

    Preliminary project
    Detailed design
    Invitation to tender
    Construction project
    Supervision of construction

  • Technical Characteristics

    Surface area: 537 m2
    Volume: 2430 m3
    Maximum span: 14 m
    Upgrading to fire safety standards

  • Period

    2021 - 2023

News

No news linked to this project.

Project Team

  • bernard-adam-equipe-ingphi

    Bernard

    Adam

    Associate - Project Manager - Civil Engineer

  • mariko_okumura

    Mariko

    Okumura

    Architect

  • Xavier Kubski-INGPHI

    Xavier

    Kubski

    Civil Engineer

Salle_Polyvalente_thumbnailMulti-purpose hall and living area
SETEC Vengeron basins