On-road works restarted with the overnight erection of the noise barrier wall of the mountain-side bridge. The noise barrier has a length of 416 m for a total area of 1450 m2. Its is made of steel frames and glass panels.
The last phase of bridge deck rehabilitation work for both bridges will restart mid-March.
Project :