The Aigremont bridge on the RC 706 B-P road between Le Sépey and Les Diablerets provides access to Les Diablerets and the Pillon pass by crossing the Raverette valley at a height of almost 100 m (330 ft.). At 488.50 m (1,603 ft.) long, the imposing prestressed reinforced concrete structure was built between 1978 and 1981 using the balanced cantilever method.

The six spans have the following lengths: 51.3 m (168 ft.), 100.8 m (331 ft.), 109 m (358 ft.), 109 m (358 ft.), 96.4 m (316 ft.) and 22 m (72 ft.). The deck consists of a box girder of variable height from 2.3 m (8 ft.) to 5.5 m (18 ft.) with vertical webs, and its overall width is 9.82 m (32 ft.). The static system is that of a floating bridge, where the three center piers are connected to the deck while the ends of the deck rest on sliding bearings on the end piers and abutments. The piers are hollow and have a truncated pyramid shape with a rectangular base.

The Le Sépey-side abutment and pier 1 rest directly on unaltered rock through superficial footings. Piers 2 to 5, as well as the abutment on the Les Diablerets side, rest on a block of concrete supported by a group of pilings measuring 2.6 m (9 ft.) in diameter. The bridge’s concrete structure is generally in good condition, but the pavement and sidewalk are worn and cracked. The wing walls of the Le Sépey abutment exhibit a network of generalized cracks due to the effects of the alkali-aggregate reaction in the concrete.

The planned measures include decontaminating the deck, replacing the expansion joints, rebuilding the walls of the Le Sépey abutment and replacing the abutment anchors.

The original sidewalk was demolished, and the drainage wells were cleaned. Prefabricated curbs were replaced. The deteriorated concrete was hydroblasted and patched with mortar. The waterproofing membrane, the pavement, and the expansion joints at the abutments were also replaced. On the Le Sepey side, the wing walls of the abutment were remediated or rebuilt. Finally, the limited-lifetime prestressed anchors that stabilize the abutments were complemented by a new series of permanent prestressed anchors.

The structure underwent seismic verification, and the bearings and dampers were overhauled.

  • Owner

    Road Department of Canton of Vaud

  • Civil Engineer

    INGPHI SA, Lausanne

  • Provided Services

    Preliminary Design
    Analysis and Seismic Retrofit
    Final Design
    Tendering
    Detailed Design
    Supervision of Construction Works

  • Technical Characteristics

    Length: 488.50 m
    Width: 9.82 m
    Maximum Span: 109 m

  • Period

    2015 - 2017

  • Construction Company

    Walo Bertschinger SA, Eclépens

  • Geotechnical

    JPF-Ducret SA, Bulle

News

No news linked to this project.

Project Team

  • Claude Broquet-INGPHI

    Claude

    Broquet

    Manager - Project Manager - Civil Engineer

  • Shkendim Salihi

    Shkendim

    Salihi

    Draftsman - Internship supervisor

  • Thibault Clément

    Thibault

    Clément

    Associate - Project Manager - Civil Engineer

villa-buchillon-ingphiBuchillon Villa
viaducs-eaux-des-fontaines-ingphiThe Eaux des Fontaines viaducts