• Competition

    Competition

  • Competition

    Project

  • Competition

    Execution

  • Competition

    Construction

As part of the redevelopment of the Nyon train station, a pavilion was planned to showcase the Coop Pronto store on its former site. The city of Nyon did not want a run-of-the-mill pavilion, so they asked that the project be integrated into the architectural approach of the whole project. The architect proposed, among other things, to create a marquee around the pavilion. This marquee was designed to not be attached to the pavilion so that it could stay in place in the event that the pavilion was removed.

The shape of the marquee was developed in close collaboration with the architect. It is characterized by a complex three-dimensional geometry composed of a triangular box beam carved by triangular faces. Triangular box-shaped beams were therefore created around the perimeter of the pavilion. They are held up by four supporting walls. The sharpest point of the beam is directed towards the outside edge of the marquee—giving it finesse.

The triangular box beam is designed like an airplane wing and made of wood. The box is composed of 3-ply panels on its three sides. The panels are internally stiffened by transverse ribs also made of 3-ply panels. Glulam furring strips stiffen the angles, and metal hardware reinforces the support zones.

The entire wooden structure was prefabricated in the workshop. It was transported in pieces and mounted on site using a crane truck and then assembled using epoxy-sealed steel rods. The triangular box beam is protected by a coating consisting of a layer of epoxy primer and four polyurethane-based layers that were applied to the finished structure.

The project involved demolishing an old building, railway tracks and stopblocks, as well as fixing platforms and drains around the station.

  • Owner

    CFF Real Estate

  • Architect

    fastt architectes associés Sàrl, Lausanne

  • Civil Engineer

    INGPHI SA, Lausanne

  • Provided Services

    Structural design
    Preliminary Design
    Tendering
    Detailed design
    Technical Supervision of Construction Works

  • Period

    2013 - 2014

  • Construction Companies

    Perrin frères SA, Nyon
    (Masonry construction)
    Max Vogelsang SA, Wohlen
    (Wood construction)

News

No news linked to this project.

Project Team

  • Jonathan Duruz-INGPHI

    Jonathan

    Duruz

    Draftsman

  • Katia Gomes-INGPHI

    Katia

    Gomes

    Project Manager - Civil Engineer - Quality Manager

  • Philippe Menétrey-INGPHI

    Philippe

    Menétrey

    Manager - Project Manager - Civil Engineer

  • Shkendim Salihi

    Shkendim

    Salihi

    Draftsman - Internship supervisor

ilots-de-bureaux-ubs-rhone-geneve-ingphi-realisationUBS-Rhône
manufacture-joaillerie-richemont-vue-aerienne-ingphiJewelry Manufacturing Facility