• Competition

    Competition

  • Competition

    Project

  • Competition

    Execution

  • Competition

    Construction

The Artlab Pavilion brings several EPFL pavilions together under one roof. The project was developed by the Japanese architect Kengo Kuma, winner of the tendering process organized in 2012.

The unifying roof is over 230 m (750 ft.) long and covered with black slate, bringing vernacular stone construction to mind. It is so long that it almost reaches a dramatic dimension. This exaggeration creates a contrast between the tradition of slated roofs and a contemporary image that is further amplified by the various inclined sections of the roof.

This contrast also characterizes the supporting structure. It is composed of 56 simple frames spaced 3.80 m (12 ft.) apart. However, each frame has a different shape because of the various inclined sections of the roof but also because the width of the pavilion varies from 6 m (20 ft.) to 16 m (52 ft.). This variable geometry requires modern construction techniques, including 3D BIM geometry management.

In order to respect the proposed architecture, a hybrid support structure was developed. Its behavior is influenced by that of a central glulam frame covered by a frame made of perforated steel plates. The two frames were attached together using glue and metal pins welded on the steel plate.

This hybrid structure is interesting because the width of the frames remains constant. It is the thickness of the metal plates that varies according to the load on the frame—as the load increases, the thickness of the metal plate increases. At the extreme, for those parts of the structure that are highly stressed—the outside hallways—the structures are mainly made of steel. From inside the pavilions, you get a homogeneous view of the frames. Furthermore, all the roof and facade elements between the frames are the same size. They are standardized, making them economically interesting as well.

The north roof is special because it forms the entryway. It is designed as an asymmetric and irregular cantilevered eaves—a three-dimensional folded structure of solid wood reinforced with threaded steel rods sealed with an epoxy resin. The vertical displacement of the end of the north roof was measured during construction and corresponded to the values determined by a finite element model.

  • Owner

    École polytechnique fédérale de Lausanne (EPFL)

  • Architect

    Kengo Kuma & Associates, Tokyo
    CCHE Architecture et Design SA, Lausanne

  • Civil Engineer and Wood structure

    INGPHI SA, Lausanne

  • Provided Services

    Design
    Tendering
    Detailed Design
    Management of the 3D geometry / BIM
    Supervision of Construction Works

  • Technical Characteristics

    Length: 260 m
    Width: 6 to 10 m

  • Period

    2012 - 2016

  • Construction Company

    Marti Construction SA, Lausanne

  • Wood Construction

    JPF-Ducret SA, Bulle

News

No news linked to this project.

Project Team

  • hugo-crespo-equipe-ingphi

    Hugo

    Crespo

    Work Planning Technician

  • Jonathan Duruz-INGPHI

    Jonathan

    Duruz

    Draftsman

  • Philippe Menétrey-INGPHI

    Philippe

    Menétrey

    Manager - Project Manager - Civil Engineer

  • Rui Costa-INGPHI

    Rui

    Costa

    Draftsman - Internship supervisor

EPFL Campus and Cosandey Place
amenagement-du-bureau-ingphiINGPHI Office Design