Fondation La Rozavère is developing a nursing home (EMS) on the Orée site in Crissier, within a complex of ten mixed-use buildings defined by the neighbourhood plan. The building is founded on a basement level including a car park connected to the already constructed basements of the adjacent buildings. Its construction requires an excavation of approximately 4.5 m, representing nearly 9,000 m³ of material, carried out in the immediate vicinity of existing structures. A significant portion of the excavated material is reused as backfill.

The load-bearing structure is designed in reinforced and prestressed concrete. The functional layout — basement parking, large living spaces on the ground floor and patient rooms on the upper floors — requires a structural grid transition between the basement and the upper levels. In the basement, the grid is adapted to parking constraints, with wider column spacing to allow vehicle circulation. On the upper floors, the arrangement of walls and load-bearing elements is determined by the layout of the rooms and circulation areas. To manage the alignment differences between levels, walls acting as shear walls are integrated, ensuring load transfer and redistribution without increasing the amount of concrete in the slabs.

To provide a ground floor free of load-bearing elements in collective areas, particularly the dining hall, prestressed transfer beams spanning 18 m are implemented using prestressing cables. All concrete elements of the project, except for the slabs, are made of recycled concrete.

The project is developed in BIM in collaboration with the architect and the MEP engineers, integrating active coordination and clash detection between digital models.

  • Client

    Fondation La Rozavère

  • Architect

    Architram SA

  • Civil engineer

    INGPHI SA

  • Construction company

    JPF SA

  • Services provided

    Preliminary design, detailed design, planning application, tender process, execution design, construction supervision

  • Construction period

    2023 - 2024

News

No news linked to this project.

Publication

No element to display.

Project Team

  • Antony

    Samuelian

    Civil Engineering Draftsman

  • Basir

    Borhani

    Civil engineer

  • Florent

    Iseni

    Civil Engineering Draftsman

  • Katia

    Gomes

    Project Manager - Civil Engineer - Quality Manager

  • Kushtrim Bajrami

    Kushtrim

    Bajrami

    Civil Engineering Draftsman

  • ninh-tran-equipe-ingphi

    Ninh

    Tran

    Associate - Internship supervisor - BIM Manager & Draftsman and builder

  • Rui Costa-INGPHI

    Rui

    Costa

    BIM Modeler - Civil Engineering Draftsman - Internship supervisor

  • Thibault

    Clément

    Associate - Project Manager - Civil Engineer

  • Xavier Kubski-INGPHI

    Xavier

    Kubski

    Project Manager - Civil Engineer

Bridge and Retaining Structures on the Tributary of the Gryonne
Colovray Sports Centre