The Richemont group chose to consolidate its expertise in clock movements and build a manufacturing facility entirely dedicated to the fabrication and assembly of these mechanisms in Couvet, in the canton of Neuchâtel, Switzerland. The dimensions of the building were determined by the surface area necessary for the production floor. The building’s footprint is a rectangle measuring 80 m (262 ft.) long by 70 m (230 ft.) wide. The architectural aspect was to lessen the perception of the main floor by partially sinking it in the ground. Only two levels are therefore visible from the street and the village.

The site, bordered to the south by the Areuse River, is characterized by an approximately 30 m (98 ft.) deep layer of soft lake and river deposits. Furthermore, the entire region is subject to the effects of slow soil stabilization. The manufacturing facility is therefore built on a network of 215 displacement piles measuring approximately 30 m (100 ft.) long. The support conditions are variable across the site, so the pilings were all installed based on a similar boring criterion (like for driven piles), to make the working level of the pilings uniform and reduce differential settlement.

The production slab has a live load of 1,000 kg/m² (205 psf) and rests on the parking area. Constraints related to loads, the risk of vibrations, and parking and manufacturing operations drove the decision to go with a prestressed concrete structure. The slab was designed to support loads in two directions over a matrix of orthogonal stringers that are aligned with the grid of columns.

The open spans are large (14.40 m or 47 ft.), as the user wanted to minimize the number of columns used. The slab over the production hall was designed to both cover large distances and be as light as possible in terms of its live weight. It is made of a steel structure with HEB 600-type main beams arranged following the grid of the columns. The steel structure is covered by ribbed sheet metal and a 14 cm (6 in.) thick concrete slab to ensure wind bracing. The roof slab is similar but has smaller spans and load capacities. The main section profiles are HEA 400 type, and the columns are rectangular and polished to blend into the glass facade.

  • Owner

    Richemont International SA

  • Architects

    A & A Atelier d’Architecture SA, La Chaux-de-Fonds
    Atelier A5 Sàrl, St-Aubin

  • Civil Engineer

    INGPHI SA, Lausanne

  • Provided Services

    Preliminary Design
    Final Design
    Detailed Design
    Technical Supervision of Construction Works

  • Technical Characteristics

    Building Volume: 60 000 m3
    Covered Surface: 5 400 m2
    Maximum Span: 14.40 m

  • Period

    2012 - 2013

  • Construction Company

    Piemontesi SA, Cernier
    (Reinforced Concrete)
    Progin SA, Bulle, Berisha SA, Roche
    (Steel Construction and Façade)

News

No news linked to this project.

Project Team

  • jonathan-krebs-equipe-ingphi

    Jonathan

    Krebs

    Associate - Project Manager - Civil Engineer

  • Katia Gomes-INGPHI

    Katia

    Gomes

    Project Manager - Civil Engineer - Quality Manager

  • ninh-tran-equipe-ingphi

    Ninh

    Tran

    Associate - Internship supervisor - BIM Manager & Draftsman and builder

  • Philippe Menétrey-INGPHI

    Philippe

    Menétrey

    Manager - Project Manager - Civil Engineer

  • Shkendim Salihi

    Shkendim

    Salihi

    Draftsman - Internship supervisor

viaduc-sur-l-a9-rennaz-ingphi-realisationViaduct over the A9
logements-bethanie-lausanne-ingphi-realisationBéthanie Apartments