Richemont International SA built its headquarters in Bellevue, near Geneva, in a park with southern exposure on the lake. The architecture captures the landscape through transparency, juxtaposing the offices between two landscapes—inside and out.

The headquarters is composed of several buildings built on a common basement. The long building is arranged in steps following the slope of the ground and is layered around a central, linear patio. The other two buildings interact at a distance, and the chalets, classified as historical buildings, contrast with these new glass structures.

The common basement connecting the various buildings is a parking garage with utility rooms and a projection room. The basement is a monolithic waterproof-concrete tank that rests on clay and is partially submerged in the water table. The land cofferdam was made of an anchored sheet-pile curtain.

The steel framework of the structure made this project truly original. Meeting the architectural requirements was not just difficult—it was demanding—given that the 10 m (33 ft) facade columns had to have the same thickness as the glass facade frames—only 80 mm (3 in.). Solid steel columns oxycut from sheets of that thickness were used.

The floors were made of steel-concrete composite slabs. The steel frame details had to be reconsidered during construction, and special assemblies for solid steel profiles were developed to stay true to the chosen materials.

Orthotropic slabs were used for the walkways.

The three wooden chalets, which date back to the mid-nineteenth century, were restored and strengthened to meet the requirements of their new purpose.

  • Owner

    Richemont International SA, Geneva

  • Architect

    Ateliers Jean Nouvel, Paris
    Eric Maria architectes associés SA, Geneva

  • Civil Engineer

    INGPHI SA, Lausanne

  • Provided Services

    Optimized Detailed Design
    Detailed Design
    Technical Supervision of Construction Works

  • Technical Characteristics

    Volume: 61 000 m3
    Excavation: 35 000 m3
    Floor space of the new constructions:
    15 200 m2
    Floor space of the renovated constructions:
    1 800 m2

  • Period

    2003 - 2008

  • Construction Companies

    Perret Construction SA, Satigny
    (Reinforced Concrete)
    Progin SA, Bulle et Haslinger Stahlbau GmbH, Feldkirchen, Austria
    (Steel Construction and Façades)
    Dasta charpente SA, Plan-les-Ouates
    (Wood Construction)

News

No news linked to this project.

Project Team

  • Claude Broquet-INGPHI

    Claude

    Broquet

    Manager - Project Manager - Civil Engineer

  • ninh-tran-equipe-ingphi

    Ninh

    Tran

    Associate - Internship supervisor - BIM Manager & Draftsman and builder

  • Philippe Menétrey-INGPHI

    Philippe

    Menétrey

    Manager - Project Manager - Civil Engineer

reconstruction-des-estacades-du-pissot-ingphi-realisationReconstruction Of The Pissot Corniche Structures
m2-station-delices-metro-lausanne-ingphi-realisationM2: Délices Station