Loading...

News

Discover our latest news

  • 18.09.2025

    Maison des Sports de Colovray présentée à la Journée de la construction bois au Palais des Congrès de Bienne

    Colovray in the Spotlight

  • 17.09.2025

    Improved accessibility and energy efficiency

  • 16.09.2025

    Upn Vennes-Chexbres TP2 – FEDRO

  • 29.08.2025

    Colovray_thumbnail

    Colovray Sports Hall – Installation of the wooden roof frame

Projects

Four projects drawn at random

  • Écublens

    Footbridge in Ecublens

  • Lausanne

    New Apostolic Church Switzerland

  • Montreux

    The Auberge Underpass

  • Lausanne

    realisation-pavillon-artlab-epfl-ingphi

    EPFL Artlab

Skills

Bridges
competences-ponts-INGPHI

Bridge design must satisfy resistance, behavior and durability criteria. Moreover, bridges organize or reorganize landscape and must do so in an adapted and suitable way.

Building
competences-batiments-INGPHI

The load bearing structures of buildings and their façades are developed to meet the requirements of modern architecture – building the land and in the space – aiming towards modernization of our built environment while preserving the architectural heritage.

Infrastructure
competences-infrastructures-INGPHI

Infrastructure planning demands knowledge in geotechnics, networks, roads, urbanism, security systems, traffic and technical equipment. All this knowledge must thus be consolidated to develop a project meeting all requirements.