Cursus
Project Manager
Dauner ingénieur conseil SA
Doctor of Sciences
EPFL
Assistant to professor R. Walther and to E. Brühwiler
EPFL
Master of Science in Civil Engineering
EPFL

References
-
Gryon
Bridge and booms at La Barboleuse
-
Riddes
Riddes Viaduct
-
Biel
PortBrügg bridge and tunnel portal
-
Geneva
CEVA Station Superstructures
-
Granges-Paccot
Securing and Repairing the Lavapesson Bridge
-
Lausanne
Bridge over the Flon
-
Bourg-en-Lavaux
Epesses Corniche
-
Montreux
The Auberge Underpass
-
Montreux
The La Veraye Aqueduct
-
Montreux
La Veraye Walkway and Footbridge
-
Court
The Eaux des Fontaines viaducts
-
Ormont-Dessous
Aigremont Bridge
-
Rennaz
Viaduct over the A9
-
Lausanne
La Mouline Underpass and Footpath
-
Plan-les-Ouates
Piaget Headquarters Expansion
-
Lausanne
M2: Jordils Station
-
Lausanne
M2: Délices Station
-
Geneva
Richemont International Headquarters
-
Aigle
Reconstruction Of The Pissot Corniche Structures
-
Aigle
Reconstruction Of The Vuargny Corniche
List of publications
-
Bridge deck deflection importance of early shrinkage – IABSE Symposium Vancouver 2017
Menétrey, Ph., Broquet C. and Pires F. “Bridge deck deflection importance of early shrinkage”, 39th IABSE Symposium Vancouver – Engineering the Future, IABSE c/o ETH Hönggerberg, Zürich, 2017, pp 928 – 935
-
Siège Richemont International
Siège Richemont International – Doc 02-2010
-
Viaduc sur l’A9 – 2
Viaduc sur l’A9 – Tracés 19-2012
-
Viaduc sur l’A9
Viaduc sur l’A9 – Tracés 11-2010
-
Viaducs Eaux des Fontaines
Viaducs Eaux des Fontaines – Tracés 09
-
Pont d’Aigremont – Tracés 07
Pont d’Aigremont – Tracés 07